Projects

PFLEIDERER CHIPBOARD MANUFACTURING PLANT

The project scope included the main production building, a finished product warehouse, a chip production building, a chip warehouse, a workshop, a fire building, a control unit, and administrative buildings. Rencons carried out this turnkey project, including all design works, shop drawings, construction works, electrical and mechanical systems, infrastructure systems, peripheral roads, and landscape areas.

Completed

Location:

Russia - Novgorod


CONTRACT TYPE:

Design-Build, Turnkey


SECTOR:

Manufacturing


CONTRACT PERIOD:

April 2004, May 2006


AREA:

30000


The project scope included the main production building, a finished product warehouse, a chip production building, a chip warehouse, a workshop, a fire building, a control unit, and administrative buildings. Rencons carried out this turnkey project, including all design works, shop drawings, construction works, electrical and mechanical systems, infrastructure systems, peripheral roads, and landscape areas.


OTHER PROJECTS