Tripoli University Faculties

Design and Build of 111.603 sqm construction area which consists of Chemical, Petroleum, Geology and Mining Departments. Design and Build of 51.301 sqm Civil and Mechanical Engineering Faculties. Due to the civil war in Libya the Contract is suspended and overall 40% progress is achieved.

Project Details

CONTRACT TYPE

Design-Build, Turnkey

SECTOR

General Building

LOCATION

Tripoli, Libya

AREA

162900