STANDBY DIESEL POWER PLANT OF THE LENINGRAD NUCLEAR POWER PLANT II

Renaissance is responsible for construction of a standby diesel power plant with diesel fuel storage which is a part of the Leningrad nuclear power plant II. The facility is located in the town of Sosnovy Bor of the Leningrad Region of Russia. The gross building area amounts to 20,186 m².

Renaissance is also constructing an administrative building (20 UCB) for unit No. 2 of the power plant. Renaissance will ensure 25,000 m³ of cast-in-place concrete structures.

Project Details

CONTRACT TYPE

Subcontract

SECTOR

Power

LOCATION

Sosnovy Bor, Russia

CONTRACT PERIOD

October 2012, April 2015

AREA

20186