EISENHÜTTENSTADT COGENERATION PLANT

The project was implemented in Eisenhüttenstadt, Germany. It included the construction of a paper machine for the production of corrugated raw paper. The annual production of the plant is 650,000 tonnes. A refuse-derived fuel cogeneration plant was built to supply the paper mill with steam and power.

Project Details

SECTOR

Power

LOCATION

Eisenhüttenstadt, Germany

CONTRACT PERIOD

January 2008, December 2011